How Much Water and Electricity Does One AI Answer Cost? And What It Means for Your Business
News – 27.10.2026
The Answer Comes in Seconds. The Price Is Hidden.
An employee asks a chatbot and gets an answer in a moment. It looks free. In reality, behind it are concrete things: servers, cooling, the power grid and chip manufacturing. All of this costs energy, water and raw materials.
Greenpeace puts it simply: what matters isn’t whether AI can be useful. What matters is who profits from it and who pays the bill for the impact on the environment.
The IEA estimates that data centre electricity consumption will roughly double by 2030, to around 945 TWh a year. Globally that works out at just under 3% of all electricity use. AI is the main driver of this growth. By the end of the decade, data centres in the US are expected to consume more electricity than the production of aluminium, steel, cement, chemicals and all other energy-intensive goods combined. Greenpeace adds that without government intervention, electricity consumption of AI data centres could be up to eleven times higher in 2030 than in 2023. Water and raw material consumption will grow alongside it.
Electricity, chips and neighbours
- AI needs a lot of electricity and water
A typical AI-focused data centre today consumes as much electricity as a hundred thousand households. New mega-projects consume up to twenty times more. In some cities, data centres already account for a large share of all electricity use. Servers also need cooling, which requires a lot of water. In countries already under water stress, such as South Africa, this is a real problem. - The chips AI runs on have a footprint of their own
AI needs electricity to run and chips to run on. Manufacturing those chips also strains the environment. Nvidia, the largest supplier of AI chips, has annual revenue of over $215 billion. Roughly 90% of that comes from chips and systems for data centres, and less than a tenth from gaming. According to Greenpeace East Asia, emissions from manufacturing these chips rose four and a half times in a single year, between 2023 and 2024. Chip production is therefore growing faster than the factories behind it can switch to clean energy. - People near data centres are pushing back
Wherever data centres are built, local opposition grows too. It’s driven by concrete concerns: land use, noise, reduced water supply, an overloaded power grid.
For example:- The city of New Brunswick, New Jersey, removed data centres from its redevelopment plan after a public backlash.
- South Dublin County Council in Ireland called for a nationwide moratorium on new data centres.
- In the UK, campaigners won permission to bring a legal challenge against a 90MW data centre in Buckinghamshire after the government admitted a serious error in approving it.
Why this concerns company leadership, not just IT
- ESG reporting. Large companies must report both their own carbon footprint and so-called scope 3 emissions, meaning emissions across the entire supply chain, in their sustainability statements. Emissions from purchased cloud services and AI tools belong here too. A company can have “green” offices of its own, but if its AI service provider runs an energy-intensive data centre, that shows up in its reporting too. This year the EU narrowed mandatory reporting under the CSRD to companies with more than 1,000 employees and net turnover above EUR 450 million. Banks, investors and large customers still ask about supply-chain emissions, though. Choosing an AI supplier therefore turns from an IT department’s technical decision into a number that appears in a sustainability statement or in a bank’s questionnaire.
- Company reputation. As the examples from New Brunswick, South Dublin and Buckinghamshire show, public opposition to data centres is growing and the topic is reaching mainstream media. Companies that use AI intensively, whether as providers or as major customers, may find themselves in a position similar to companies once associated with coal power or the textile industry’s use of child labour: the public asks “where does this actually come from”, and silence or evasive answers look worse than a prepared, transparent position. Communications and PR teams should know how to respond to these questions from journalists, investors and employees before they come.
- Operating costs. In regions where the power grid is already near capacity, typically Ireland, but also parts of the US such as Virginia or Texas, new data centres compete for limited grid capacity with ordinary businesses and households. This can mean higher electricity prices, longer waiting times to connect new operations, or even limits on a company’s own planned expansion if it’s located near an area with a high concentration of data centres.
What a company can do right now
- Don’t always use the most powerful model. A smaller model is often enough and uses less energy and money.
- Include AI vendors in due diligence, just like any other supplier. Ask about emissions and chip manufacturing conditions.
- Watch the new regulation. The EU is gradually rolling out rules on data centre transparency. Whoever prepares first gains an advantage.
- Talk about it openly. Employees and customers want to know how the company uses AI and what impact it has.
AI will still be part of business in five years. The key question is how to use it responsibly. We can help you find out what risk AI brings to your company and set up reporting that holds up with auditors and investors. On an introductory call with Martin Valášek we’ll go through governance, concrete use cases and internal processes so that your AI delivers value while minimising risk. Contact us: martin.valasek@leitnerleitner.com.
Sources
Greenpeace International: The energy and environmental impact of AI and how it undermines democracy (2 April 2026)
https://www.greenpeace.org/international/story/82486/ai-energy-environment-democracy/
IEA: Energy and AI (10 April 2025)
https://www.iea.org/reports/energy-and-ai
Enline Energy: Why the AI Data Center Boom Is the Biggest Grid Story of 2026 (4 May 2026)
https://web.archive.org/web/20260612204217/https://enline.energy/articles/ai-data-center-grid-capacity-2026
NVIDIA: NVIDIA Announces Financial Results for Fourth Quarter and Fiscal 2026 (25 February 2026)
https://nvidianews.nvidia.com/news/nvidia-announces-financial-results-for-fourth-quarter-and-fiscal-2026
Greenpeace East Asia: Chipping Point: Tracking Electricity Consumption and Emissions from AI Chip Manufacturing (10 April 2025)
https://www.greenpeace.org/static/planet4-eastasia-stateless/2025/04/5011514f-greenpeace_chipping_point.pdf
European Union: Directive (EU) 2026/470 of the European Parliament and of the Council of 24 February 2026 (OJ L, 26.2.2026)
https://eur-lex.europa.eu/eli/dir/2026/470/oj
Google Cloud Blog, Measuring the environmental impact of AI inference, 21. 8. 2025,